- but, it turns out we'll be delayed by a couple of weeks. Given the rain this summer, and dearth of contractors, I suppose that's not too horrible. Especially if all the finishing touches come off very well.
- but Nina and I are too aware of all of the unnecessary delays in the spring and early summer to chalk the delays up to OCD-type craftsmanship.
Nevertheless, there has been a lot of activity at the house the past two weeks. Take a peek:
| Sod in the front and in the back. Somehow, this one cosmetic detail has had a huge impact on the house - now, somehow we are willing to believe we'll actually move in one day. |
| Painting w/accent walls was going on in earnest this week. |
![]() |
| The deck, a bamboo composite, was finally installed this week. It looks pretty cool from up above (view from master BR). |
![]() |
| Tile is all but done, and the plumber even installed a lot of the fixtures this week. |
![]() |
| Little shelf inside the shower stall -- these are the cool details that we really love. |
![]() |
| Bathtub - that we'll probably never use! |
| Let there be light - and plenty of it! This isn't our disco room, but our kitchen. The bulbs haven't yet been recessed into their respective cans. |
![]() |
| You can see that down the "line" along the wall, the recessed lights are in fact recessed. |
![]() |
| Ceiling fans also installed! |
So we have 3-4 weeks left, and a lot of ground to cover in that time.
Tasks I'm led to believe we'll cover in the next week:
1. finish painting --> I think I was told this was actually called (no joke) the "final first pass" or something to that effect.
2. garage door install
3. downspout/gutter install
4. finish landscaping
5. measure and order countertop for kitchen







No comments: